Tenant Improvement at Commercial Office Building With No Disruption to Tenants

As part of a renovation of multiple commercial office buildings in its portfolio, a national real estate owner hired The Avalon team to add popular building amenities and update common areas in the occupied multi-tenant office building. Upgrades included the addition of a 1,600 SF fitness center, complete with a yoga studio, locker rooms, and […]
Tenant Improvement at Swedish Medical Center in Englewood Colorado

The Avalon team performed a five-phase medical office remodel at Swedish Medical Center in Englewood, Colorado. The project was a 9-month, occupied remodel where the Avalon team was able to successfully provide safe and comfortable accommodations throughout construction, thus avoiding business interruption challenges. A second key benefit that the Avalon team provided on this project […]
Tenant Improvement at Tequilas Mexican Restaurant Thornton

The Avalon team served as Tenant Improvement Contractor for the renovation of Tequila’s Mexican Restaurant in Thornton, Colorado. The property had previously operated as a national burger chain and needed to be repositioned in order to fit the Tequila’s brand. Architecture designs called for an entire overhaul of the exterior facade; the roof line was […]
Tenant Improvement at Colorado Gym and Fitness Center

The Avalon team performed Tenant Improvement services on a core and shell space for a state of the art fitness tenant. The existing space included 6 floors of residential condos above the fitness space. The construction required acoustical engineering to eliminate the vibrations and high decibel level the center operates at. All equipment (mechanical, sprinklers, […]
Tenant Improvement for Restaurant Chain – Snarf’s Sandwiches

The Avalon team served as the Tenant Improvement Contractor for the renovation of Snarf’s Sandwiches in Littleton, Colorado. The property needed to be fully renovated in order to fit the Snarf Sandwich brand. The Littleton (Wadsworth) location also features an outdoor patio. Interior renovations included a new service counter, new lighting, new seating arrangements, upgrades […]
Tenant Improvement for Barbershop in Wellesley

The Avalon team performed tenant improvement services on a core and shell space for a high-end barbershop, Barber Walter’s in the middle of downtown Wellesley, Massachusetts. The space consists of 895 square feet including an ADA bathroom, janitor’s closet, and back storage. The scope of work included engineered wood flooring throughout, adding to the existing […]
Tenant Improvement at Women’s Care of Colorado

The Avalon team worked closely with hospital management to optimize the 4,000 SF Medical Office Suite at Sky Ridge Medical Center. The renovation included three restrooms, a waiting area, eight exam rooms, and four provider offices, improving the quality and efficiency of the space. The Avalon team provided responsiveness and seamless coordination with the on-site […]
Tenant Improvement for Empire Park

Denver’s Empire Park underwent major renovations to its three buildings. The Avalon team upgraded common areas and business center lobbies with premium finishes, floor to ceiling Italian tile, elevator accents, and glass handrails. Dated storefront doors were replaced and contemporary accent lighting enhanced corridors to ensure ease of use and accessibility to tenants and visitors. […]
Tenant Improvement for CLMBR Fitness and Retail

The Avalon team was selected as the General Contractor to remodel an existing restaurant in Denver’s Cherry Creek North shopping district into a high-end retail store. The new retail space was then adjoined to the neighboring fitness studio to become CLMBR’s flagship showroom. The store was designed to encourage customers to test out their patented […]
Commercial Office Interior Construction for Architect in Denver

The Avalon team performed the buildout of a 3,200SF office space for a great tenant improvement architect partner, Kieding. The project required full demo of the existing space and incorporated many finishes into the new design. The millwork package represented a significant portion of the budget with custom cabinetry and shelving throughout. Updating lighting, sliding […]